You don't have javascript enabled. Good luck with that.
Pencarian
Areal Kosong di Tanggul Laut Pangkalan Pasir Diminta Dijaga

Land Used as NCICD Phase A Project must Be Guarded

City Secretary, Saefullah, revealed the project of the National Capital Integrated Coastal Development's (NCICD) Phase A, Kampung Pangkalan Pasir, RW 03, Kalibaru Urban Village, Cilincing, North Jakarta should be guarded.

The land has 20 meters width with 1.3 kilometers length

According to him, it is needed to anticipate illegal occupancy by irresponsible people.

"The land has 20 meters width with 1.3 kilometers length. I want, North Jakarta Mayor to do temporary guard," he expressed, Thursday (8/10).

Jakarta-Rotterdam Establish Sister City Cooperation

He added, in the near future, Jakarta Provincial Government along with Ciliwung-Cisadane Flood Control Office (BBWSCC) would conduct a discussion related to the utilization of the area.

"We'll talk it later. We decide it to be discussed in executing meeting with Head of BBWSCC next year," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye357 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye352 personAldi Geri Lumban Tobing
close